This week we started the remodeling project on our house. I plan on taking photos of the process. It’s a decent sized project. We are lowering the floor in the basement, putting in two egress windows, installing a new furnace and air conditioning unit and adding a mud room to the back of the house. It’ll be just a little under four months. They start demolishing the floor in the basement this week.

Here is what it looks like now.

Wooden backyard deck outside French doors with partial fence, garden shrubs, and wooden post footings along the edge Wooden deck at the back of a beige house with French doors, a single door with a small roof overhang, and large windows Staircase leading down to a basement with gray painted steps, white balusters, wood handrails, and a yellow-lit concrete floor below. Narrow basement staircase with gray painted steps white balusters and a wood handrail leading up to an open door Unfinished basement with painted concrete floor, gray block walls, support columns, a furnace unit, and small hopper windows near the ceiling. Unfinished basement with painted concrete floor, white support columns, exposed ceiling joists, ductwork, and a furnace in the utility area. Unfinished basement with painted concrete floor, support columns, a furnace, water heater, and a blue cat litter box on a green rug Empty unfinished basement with painted concrete block walls, gray floor, support columns, exposed ceiling joists, and a small window. Square hole jackhammered in a concrete basement floor near a corner wall, exposing dirt and gravel beneath Unfinished basement with painted gray concrete floor, support columns, utility sink, water heater, and stairs leading up