For 18 weeks I wrote a weekly update on the progress of our remodel project. At the end the work was really small items, just working through a punch list and we were starting to live in the space. Now that everything is in place and we have been fully using the space for a few …
Keep reading · 9 minutes: Morgan Remodel Final Pictures
There are still a number of things on our punch list, but, the remodel is done! When we started the project it was expected to take 16 to 20 weeks, and we ended it right at 18. This week the flooring was installed, the electrical was finished, the network and other low voltage …
Keep reading · 1 minute: Remodel Update Week 18
This was a big week for the project! The painting is mostly done now. The final colors are on all the walls, the tape is off, the trim is all painted. The railing is finished above the mudroom and I’m really excited about the space up there. I’m completely sold on putting a door …
Keep reading · 1 minute: Remodel Update Week 17
This week was the 16th week of the remodel. In the very first project plan we would be done now. Remodeling, like any other complex project has changes. We have about two more weeks in front of us and then I’m sure there will be small things after that.
This week the built-in …
Keep reading · 2 minutes: Remodel Update Week 16
More finish work continued this week. The exterior of the new mudroom got painted. The real door arrived and will be put in after painting. The bannister got installed in the family room as well as the hand railing and the utility and electrical rooms are being finished so we can …
Keep reading · 1 minute: Remodel Update Week 15
This week was all about finish carpentry. Happily the tile floor in the mudroom got installed and it does look really nice. The finish carpenters showed up and put the doors in, got trim up, installed the pocket doors and generally “finished” things. They are doing an excellent …
Keep reading · 1 minute: Remodel Update Week 14
I think week 13 of the project will go down as the least exciting week for me. The only thing to get worked on was the mudroom tile floor. That was out of necessity, the mudroom is the access point to the basement and in the laborious process of putting in the tile floor access …
Keep reading · 1 minute: Remodel Update Week 13
We are entering the home stretch on the remodeling project. The work now is no longer about structure and wire. We are dealing with drywall mud, paint and finish work. This week all of the drywall got primer and the ceilings were all painted. The siding on the exterior of the …
Keep reading · 1 minute: Remodel Update Week 12
This week the remodeling was all about drywall mudding and taping. Tape, mud, repeat. Repeat. Repeat some more. We were out of town which was a nice thing. It was fun to see the walls looking so nice and smooth when we got back. It feels like we are entering the home stretch now.
I’m posting this weeks update a little early, the progress is so fun to see. The theme for this week is drywall! The framing is gone, and in it’s place is grey drywall everywhere you look. I was amazed that one guy did it all. The result of these huge 54" by 12 foot sheets of …
Keep reading · 1 minute: Remodel Update Week 10