August 28, 2011

Remodel Update Week 12

We are entering the home stretch on the remodeling project. The work now is no longer about structure and wire. We are dealing with drywall mud, paint and finish work. This week all of the drywall got primer and the ceilings were all painted. The siding on the exterior of the house is being put back together, which is more complicated than it appears. The front of our house is pretty as we are replacing the trim. The trim was pine and was rotting out. Also the railing is being replaced to match the railing on the back. Lastly the temporary wall in our kitchen was removed. It was a bit shocking how large the kitchen felt now that we don’t have that plastic wall up anymore.

This week the tile is going to be installed in the mudroom and more finish work. We are still really excited about the project and can’t wait to start living in the new spaces!


Morgan Remodel 2011 Dear Diary


Previous post
Mazie’s 2011 “So Long Summer” Performance Today was the 2011 So Long Summer show! Our neighbors the Miller’s host this every year for five years running now. It’s the last Sunday before
Next post
Tyler’s Tractor Shortly after Tyler was born my Mom got him a pedal tractor. At my Grandparents farm there was always a metal pedal tractor that my cousins and I